Skip to main content
Home
Geothermal Rising :: Using the Earth to Save the Earth
Using the Earth to Save the Earth

Main navigation

  • Our Organization
    • Membership
    • Mission and Vision
    • Our Members
    • Board of Directors
    • Staff
    • Committees
    • U.S. Policy Council
    • Canada Policy Council
    • Student Committee
    • Contact Us
    • In Memoriam: Remembering Our Geothermal Pioneers
  • Our Impact
    • Regional Interest Groups (RIGs)
    • In the News
    • Workforce Success
    • GR Museum Exhibit
    • Honors & Awards
    • Bulletin Blog
  • Events
    • 2027 Geothermal Capitol Hill Day
    • 2027 Geothermal Rising Conference
    • 2025 Geothermal Rising Conference
    • 2026 Geothermal Rising Conference
  • Resources
    • Find Our Resources
    • Library
    • Geothermal Basics
    • Frequently Asked Questions
    • Geothermal Power Production
    • Direct Use Geothermal
    • Geothermal Ground Source Heat Pumps
    • Geothermal Directory
    • Student Resources
    • Job Board
    • Video Library
    • Merchandise
  • Invest in Our Impact
    • Join Us
    • Donate
    • Receive the newsletter
  • Member Login
    • Exhibits & Sponsors
      • Exhibit & Sponsor Information
      • 2026 Exhibitors & Sponsors
    • About
      • About
    • Registration
    • Technical Program
      • Author Information
      • Author Resources
      • Technical Paper Authors
      • Technical Poster Authors
      • Technical Program Topics
    • Hotel & Travel
      • Hotel
      • Why Houston?
      • International Travel Information

Digging into the Geothermal Production Phase with Multiphysics Simulation

Submitted by bschmidt on Nov 16, 2026
  • Read more about Digging into the Geothermal Production Phase with Multiphysics Simulation
Date
Nov 18, 2026
Geothermal Community
Geothermal Rising
Download PDF
Image
COMSOL member focus graphic

Geothermal energy extraction involves strongly coupled physics interactions in some of the planet’s most extreme, hard-to-observe environments. For decades, the geothermal industry has relied on COMSOL Multiphysics® simulation software to create high-fidelity predictive models of enhanced geothermal systems (EGS) in these environments, using the results to design effective systems and prove that engineered subsurface reservoirs can work.

As the industry now shifts its focus to optimizing EGS for long-term performance, the COMSOL® software’s capabilities have been expanded to provide state-of-the-art solutions for predicting, testing, and monitoring operational conditions.

Multiphysics Modeling in the Research Phase

EGS involves thermodynamic, hydraulic, chemical, and mechanical interactions that determine how the plant functions. Long-term permeability, flow strength, and heat recovery—subsurface factors essential to energy output—each depend on the complexity of these interactions. Understanding the future outcomes of these phenomena before investing is crucial for ensuring lasting efficiency.

A geothermal doublet is an open-loop configuration consisting of injection and production wells. This configuration can be used in conventional hydrothermal reservoirs with natural permeability or in EGS reservoirs with engineered fracture networks.

A geothermal doublet model built in COMSOL Multiphysics® illustrates the coupled subsurface flow and heat-transfer processes common to both system types. The example represents a hydrothermal reservoir with three geological layers intersected by a predefined fault zone (Figure 1). The geometry is constructed using an artificial dataset, with distinct hydraulic and thermal properties assigned to the geological layers.

Image
Geometry of the model including three geological layers, the fracture, and the doublet’s production and injection sides (edges).
Caption
Figure 1. Geometry of the model including three geological layers, the fracture, and the doublet’s production and injection sides (edges).

The COMSOL Multiphysics® software provides all of the necessary physics couplings and boundary conditions for the model. In the coupling of interest, heat transfer and subsurface flow influence one another bidirectionally: Heat is transported by advection, and the fluid properties, such as density and viscosity, depend on the temperature.

By coupling subsurface flow and heat transfer, the model captures heat transport by moving groundwater and the influence of temperature-dependent fluid properties on flow. Once the initial values and boundary conditions are defined, the model runs a time-dependent simulation to measure production temperature over 15 years.

Image
Temperature (K) distribution in the fracture and streamlines for the Darcy velocity field at 1, 5, and 15 years.
Caption
Figure 2. Temperature (K) distribution in the fracture and streamlines for the Darcy velocity field at 1, 5, and 15 years.

The simulation reveals that after 15 years of operation, the temperature in the fracture zone will drop significantly; over just 10 years, the production temperature will decrease by about 20 K (Figure 3), indicating that the doublet will not provide a stable, long-term energy supply under the current configuration.

Image
Production temperature over 10 years.
Caption
Figure 3: Production temperature over 10 years.

The model parameters, from doublet orientation to the materials or fluids used, can be adjusted until the desired production outcome is achieved. The software’s long-term predictive capability has proven invaluable in research and planning, allowing users to adjust conditions and iterate efficiently.

Multiphysics Modeling in the Production Phase

COMSOL Multiphysics® can also be used in day-to-day EGS operations, with multiple practical applications thanks to the software’s compatibility with field data, robust yet flexible interfaces, and built-in functionality for creating streamlined, intuitive simulation apps that enable users without modeling expertise to run simulations based on underlying high-fidelity models.

Reservoir Geometries Built from Field Data

A model of CO₂ storage in a geological formation demonstrates how real-world mapping data can be used to create high-fidelity geometries of subterranean reservoirs in COMSOL Multiphysics®.

The model was built using a dataset from the Johansen Reservoir, a saline aquifer off the coast of Norway. The model uses geological geometry, porosity, and permeability data from the Johansen Reservoir dataset, demonstrating how spatially varying geological properties can be incorporated into subsurface simulations.

The COMSOL® software provides flexible meshing tools and numerical solvers to efficiently handle complex reservoir geometries and spatially varying material properties.

Image
Permeability in the Johansen Reservoir geometry.
Caption
Figure 4: Permeability in the Johansen Reservoir geometry.
Digital Twin Monitoring

Subsurface conditions are often difficult to observe directly, making field measurements essential for refining reservoir models during operation.

COMSOL models can be integrated with external data systems to incorporate measurements such as temperature, pressure, and flow rate. These measurements can be used to update model parameters, improve estimates of reservoir conditions, and evaluate future operating scenarios.

When combined with automated data exchange and appropriate model validation, this approach can form the basis of a digital twin for geothermal reservoir monitoring and optimization.

Simulation Apps

Once a model is created, you can deploy it across the organization using simulation apps. Apps package a full model’s computational power into simplified user interfaces, with input and output fields tailored to any team or industry.

For example, a multiphysics model of ground heat recovery for radiant floor heating measures heat transfer in a shallow geothermal heat recovery system where cold water enters through the pipe inlet and is returned as hot water through the pipe outlet.

A simulation app based on this model streamlines the interface for general users, letting them focus on input parameters and computational outputs without extraneous model information or requiring foreknowledge of the software.

Image
The user interface of a simulation app with customized input fields that are based on a COMSOL model of ground heat recovery for radiant floor heating.
Caption
Figure 5: The user interface of a simulation app with customized input fields that are based on a COMSOL model of ground heat recovery for radiant floor heating.
AI-Powered Capabilities in COMSOL Multiphysics

COMSOL Multiphysics incorporates AI technologies that complement physics-based modeling and simulation. These capabilities range from AI-assisted modeling and programming to surrogate modeling used to accelerate computation of multiphysics models, simulation apps, and digital twins.

AI-Assisted Modeling

The built-in Chatbot window in COMSOL Multiphysics provides AI assistance directly within the COMSOL Desktop environment. By connecting to a large language model (LLM), users can ask modeling questions, get help with simulation workflows, and generate or troubleshoot COMSOL API code.

Users can also attach entire models or selected model components to their prompts, enabling the chatbot to provide context-aware assistance based on model settings, variables, expressions, and other information.

This integration makes AI assistance available directly within the modeling environment. The soon-to-be-released COMSOL Multiphysics version 2027 will extend AI support with MCP server functionality to enable agentic workflows.

Surrogate Modeling

Surrogate models provide fast, computationally efficient approximations of detailed physics-based models. COMSOL supports several techniques, including deep neural networks (DNNs) and Gaussian processes (GPs).

DNN and GP surrogate models can be trained on simulation results or experimental data to predict model responses for different input parameters. Once trained and validated, they can provide predictions in a fraction of the time required for a full simulation.

Applications include design optimization, parametric studies, inverse modeling, and interactive simulation apps.

AI-Enhanced Digital Twins

AI functionality can also be used to enhance the performance of digital twins or dynamic models that interact with real-time field data.

When datasets about field conditions are incomplete, as is often the case in geothermal digs, DNNs can be used to interpolate gaps in the data. When trained on enough field data, these automatic interpolations can replicate conditions at the highest possible fidelity, creating digital twins with powerful monitoring capabilities.

Takeaways for the Geothermal Community

Atop the bedrock of its high-fidelity multiphysics simulation software platform, COMSOL has added capabilities that can be used by geothermal engineers to accelerate innovation in both research and production.

Browse the COMSOL product suite to explore solutions for designing the future of geothermal energy extraction.

Member Focus articles are a paid member benefit and are provided by the featured Geothermal Rising member. They do not necessarily represent the views or positions of Geothermal Rising. Publication does not constitute an endorsement of the featured company, its products, services, or opinions.

Member Focus: COMSOL is advancing geothermal research and production through high-fidelity multiphysics simulation, enabling engineers to model complex subsurface interactions, predict long-term reservoir performance, and optimize energy extraction. Using COMSOL Multiphysics®, geothermal developers can evaluate coupled heat transfer and fluid flow, incorporate geological and operational data, and assess production scenarios before and during deployment. The article explores applications ranging from enhanced geothermal system (EGS) modeling and reservoir monitoring to simulation apps and digital twins. It also examines how AI-assisted modeling, surrogate models, and machine learning can accelerate computational workflows and support more informed decisions throughout the geothermal project lifecycle.

Geothermal Discovery Day at Children's Museum Houston

Submitted by bschmidt on Nov 12, 2026
  • Read more about Geothermal Discovery Day at Children's Museum Houston
Date
Nov 16, 2026
Geothermal Community
Geothermal Rising
Image
GDD 2026 photo collage

On Sunday morning, September 20th, Geothermal Rising (GR) welcomed 117 participants to a day of interactive learning at Children's Museum Houston (CMH). This event was the second Geothermal Discovery Day (GDD), and was hosted during the 2026 Geothermal Rising Conference (GRC) in Houston, TX. Designed for children and families to discover the science beneath their feet and explore how Earth's natural heat can help power and heat our world.

With activities for a range of ages, participants explored electricity, thermal conductivity, geology, volcanology, and the process of accessing geothermal resources. The goal was simple: make geothermal energy approachable, engaging, and fun for the next generation.

From Earth's Heat to Clean Power

The day began with a kid-oriented Geothermal 101 presentation where participants learned what geothermal energy is, where Earth's heat comes from, and how that heat can be used to generate electricity and provide heating and cooling.

Next, a Children's Museum Houston educator brought electricity to life with an interactive demonstration using a Van de Graaff generator. Participants even formed a human circuit, turning themselves into part of the experiment and experiencing firsthand how electrical circuits work.

After the opening presentations, participants split into three groups and rotated through three interactive stations, each offering a different way to explore geothermal concepts.

Image
GDD 2026 photo collage
The Science of Thermal Conductivity

How does heat move through different materials? At the thermal conductivity station, participants explored this question through a hands-on demonstration. This included a thermal electricity demonstration available through the University of Utah's Utah FORGE program public lesson plans. The activities also featured a reading of The Happy House by Egg Geo, introducing geothermal heating and cooling applications through storytelling and games.

Volcanoes, Rocks, and Earth's Interior

At the volcanology and geology station, participants explored the dynamic processes that have shaped our planet. Learning about Earth's interior, volcanic activity, and geological formations helped connect the forces beneath the surface to the natural heat that makes geothermal energy possible.

Drilling for Geothermal Cake

One of the day's most memorable activities combined learning with a sweet treat. The drilling demonstration used cake to help participants visualize what it means to drill into the unknown subsurface in search of geothermal resources. By assigning everyone a role from CEO to geologist to drilling engineer this hands-on activity led participants to explore the basic concepts behind targeting a well in a fun and tangible way.

After the organized programming wrapped up, participants explored the Children Museum Houston’s award-winning interactive exhibits, extending the day's exploration beyond geothermal.

Thank You to Our Sponsors and Volunteers

We want to extend a huge and sincere thanks to the sponsors and volunteers who helped make the 2026 Geothermal Discovery Day possible! This year we are thrilled to have had support from Egg Geo, Hephae Energy Technology, Coso Operating Company, and US Navy GPO (Geothermal Program Office). Additionally, we are so grateful to the GR Workforce Success Group and the GR Student Committee volunteers who created an engaging and welcoming learning environment for all participants.

Image
GDD 2026 photo collage
Making Geothermal Education Accessible

Geothermal Discovery Day reflects GR's commitment to increasing public awareness of geothermal energy and creating opportunities for people of all ages to learn about its potential. Learning through play - the demonstrations used educational resources developed to make complex scientific concepts fun and accessible to learners of all ages.

Introducing geothermal energy to children doesn't have to begin with complex engineering or technical presentations. It can start with a question about where electricity comes from, an experiment that makes heat transfer visible, a lesson about volcanoes, or a cake that illustrates drilling beneath the Earth's surface. The mix of adults and children highlighted the opportunity to engage with everyone about energy, science, and the world around them.

Looking Ahead to Reno in 2027

Geothermal Discovery Day will continue to grow as an opportunity to bring geothermal education beyond the conference and into the community. Following two successful events, GR plans to host its third GDD on October 24th, 2027, in Reno, NV during the next GRC. By combining science, curiosity, and hands-on learning, GR hopes to continue energizing children and families to explore the incredible heat that lies beneath our feet.

Quote
This event was great! Exceeded our expectations!
Attribution
2026 GDD participant
What happens when you combine the science of energy with curious kids, hands-on experiments, and a geothermal cake? You get Geothermal Discovery Day! Local Houstonia Families and conference attendees explored the Children’s Museum Houston during the 2026 Geothermal Rising Conference.

Geothermal EPC Integration: From Heat to Commercial Power

Submitted by bschmidt on Oct 21, 2026
  • Read more about Geothermal EPC Integration: From Heat to Commercial Power
Date
Oct 21, 2026
Geothermal Rising
Geothermal Community
Download PDF
Image
B&M Member focus logo

The commercial challenge for geothermal power is not only whether the subsurface technology works, but also whether the full project can be developed, financed, procured, built, and interconnected fast enough to meet market demand. Engineer-procure-construct (EPC) integration changes the value proposition, shifting a promising heat resource into a coordinated power project with fewer handoffs, earlier cost visibility, and clearer accountability.

Enhanced geothermal systems (EGS) and advanced geothermal systems (AGS) are creating new ways to access heat resources that conventional geothermal development could not readily reach. But proving a subsurface resource is only one part of delivering a commercial power project. Developers must also convert heat into electricity, connect generation to the grid, and build the supporting infrastructure needed for reliable power generation. These surface-side requirements raise a strategic question for emerging geothermal companies: Should operators build these capabilities internally or partner with an experienced EPC contractor?

While subsurface technology may involve first-of-a-kind challenges, above-ground infrastructure largely relies on established power design and construction principles. An EPC partner helps developers leverage these established frameworks, letting them focus resources on novel subsurface technology.

Turning heat into an operating power project

After identifying and validating a subsurface resource, geothermal developers still face substantial work before delivering power to the grid.

An Organic Rankine Cycle (ORC) system is a well-established technology that transfers heat from the subsurface to a different working fluid that is used to drive turboexpanders for power generation. Equipment outside the ORC is typically more site-specific and can include gathering systems, water treatment, utilities such as compressed air and nitrogen supply, and electrical equipment.

Additionally, civil work is required for well pads, environmental permitting, interconnection facilities, and transmission infrastructure. The surface scope also varies with the selected geothermal subsurface technology.

For example, an EGS project may require more makeup water and greater consideration of the brine brought to the surface, while a closed-loop AGS project can avoid some of those issues.

Quote
Division of labor allows developers to focus their capital and talent on geological innovation while trusting an integrated partner to deliver the commercial power asset.
Attribution
Tisha Scroggin-Wicker, Director of New Energy Solutions
Image
Integrated EPC delivery
Caption
Integrated EPC delivery brings engineering, procurement, and construction together to coordinate the complex surface infrastructure required to turn a geothermal resource into a commercial power project.

For developers whose core insight and advantage lie primarily in geology and subsurface heat extraction, many of these surface-side considerations fall outside their organization’s core competencies. That is where an EPC contractor can bridge the novel technology under development and the broader infrastructure needed to make it a commercial power asset.

Interfaces matter as much as components

Difficult work often occurs at the intersection of scopes.

One of the most important interfaces is the gathering system between the subsurface resource and the ORC equipment.

The geothermal developer must understand what the wells will deliver from a thermal resource perspective, while the ORC provider has specific requirements for the heat source entering its equipment. The gathering system must successfully connect those sides.

An integrated EPC contractor can occupy that middle ground and facilitate that connection. The EPC firm might review ORC vendor submittals, design and construct associated balance-of-plant systems, and coordinate with the developer on what the subsurface resource is expected to provide. Keeping these activities within an integrated project structure reduces the number of organizational boundaries the developer must manage directly.

The same principle extends to the electrical side of the project. A generation facility must be designed to produce power and satisfy requirements of the applicable grid operator or independent system operator. Consider interconnection and transmission requirements alongside plant design, rather than as isolated downstream activities.

Using multiple contractors on a project increases complexity and creates challenges in coordinating scope, schedules, and responsibilities.

Access to an organization, not just individuals

Developers could reasonably consider building more of these capabilities internally. Hiring experienced engineers and project managers can lower direct cost. But assembling talented individuals is different from building a functioning project-delivery organization.

Major capital projects rely on systems, processes, resource networks, and specialized disciplines that may be needed only at specific stages or for limited durations during execution.

A developer could hire capable people with EPC backgrounds, but those individuals would still need to form an organization that can coordinate design, procurement, construction, and project controls at scale. Taking a group of individuals from a patchwork of backgrounds and creating a well-functioning execution organization takes years and requires growing pains that increase risk on early projects.

Workload also changes significantly over a project's life cycle, let alone a portfolio's. Some disciplines may be needed intensively for a period and then scarcely at all.

The value of EPC becomes even clearer when an unusual need arises. A project might suddenly require a specialized water resource study, assistance navigating an endangered species near the site, or a similarly narrow technical assessment. A project might suddenly require a specialized water resource study, assistance navigating an endangered species near the site, or a similarly narrow technical assessment.

Without the extended network of a multidisciplinary EPC organization, the developer would need to identify another consultant, negotiate another contract, and manage another project interface — all for a relatively limited scope. These minor unforeseen scope additions can cause months of delay due to bid evaluation, contract negotiation, and the inevitable slowdown in information sharing when consultants must manage the risk of sharing information with third parties. The advantage, then, is access to an organization built to deploy the right disciplines at the right point in a project.

Current market conditions raise the value of visibility

That organizational reach is particularly important in today's power and infrastructure market.

Labor availability is tight in many regions, and geothermal projects are competing for workers with the construction of data centers, conventional generation, transmission projects, and other large infrastructure investments.

Equipment lead times pose similar challenges. Contractors executing multiple projects continually have ongoing visibility into procurement conditions for everything from transformers and breakers to structural steel and piping. They can incorporate that market insight into schedules before procurement constraints affect the critical path.

Historical assumptions can become outdated quickly. A component that once presented little schedule risk can become a major constraint if its lead time increases sharply and unexpectedly. Discovering that change after following an older development schedule can create months of avoidable delay.

Current market visibility can be as important for advanced geothermal developers as technical experience.

Early EPC involvement could give the project access to information being gathered across an active portfolio of power and infrastructure work.

Image
Workers at Texas substation
Caption
Early EPC involvement helps align construction, workforce planning, procurement, and electrical infrastructure before labor constraints, equipment lead times, or interconnection requirements affect the project schedule.

Integration benefits are strongest when they begin during development rather than at construction.

A developer could complete early estimates internally or with one consultant, then bring in a larger EPC organization later. That approach creates a handoff exactly when a project becomes more complex. A new team must learn the design basis, confirm assumptions, and align resources before moving into the next phase.

Bringing an EPC contractor into the development process earlier can promote continuity as estimates mature from preliminary scoping to a final investment.

Third-party estimating also provides a useful outside perspective on project economics.

An independent cost-development process can help test internally held assumptions before major commercial or financing decisions are made. This brings timely, outside, experienced industry perspective to the project.

The result is a development process in which engineering, estimating, procurement planning, and project execution can inform one another before critical commitments are made.

Bringing the entire picture together

AGS and EGS projects will continue to push technical boundaries in the subsurface. That is where much of the industry’s dramatic upside lies —its advancement is higher risk and higher reward. The surface infrastructure is a fundamentally different category of challenge and should be treated as such.

A mature ecosystem of organizations can deploy new infrastructure using proven technologies.

A practical first step is to identify the specific constraints that could govern the project, including long-lead equipment, labor, interconnection requirements, and the relationship between subsurface development and surface construction. Those elements can then be brought together in an integrated development schedule, rather than progressing independently and relying on later alignment.

The future of geothermal energy relies on subsurface innovators pushing technical boundaries. However, building the surface infrastructure to harvest that heat requires a different set of capabilities. Instead of building complex design and construction organizations internally, developers can leverage established teams that routinely deliver power infrastructure. This division of labor lets developers focus capital and talent on geological innovation while trusting an integrated partner to deliver the commercial power asset.

Quote
The commercial challenge facing geothermal is whether the full project can be developed, financed, built, and interconnected at a pace that matches market demand.
Attribution
Chris Ruckman, Vice President of New Energy Solutions

Member Focus articles are a paid member benefit and are provided by the featured Geothermal Rising member. They do not necessarily represent the views or positions of Geothermal Rising. Publication does not constitute an endorsement of the featured company, its products, services, or opinions.

Member Focus: Burns & McDonnell examines how integrated engineering, procurement, and construction (EPC) can help transform promising geothermal resources into commercial, grid-connected power projects. As enhanced geothermal systems (EGS) and advanced geothermal systems (AGS) expand access to subsurface heat, developers must still coordinate Organic Rankine Cycle (ORC) equipment, gathering systems, water treatment, electrical infrastructure, and transmission interconnection. The article explores how interfaces between these systems, labor availability, long-lead equipment, and early cost estimates can influence project schedules and investment decisions. It also considers the trade-offs between building project-delivery capabilities in-house and partnering with a multidisciplinary EPC organization. By bringing engineering, procurement planning, and construction expertise into development earlier, geothermal companies can improve coordination and cost visibility while maintaining their focus on subsurface innovation.

Exploring Geothermal Potential in Rico, Colorado: Supporting Rural Decarbonization & Cultivating Small-Town Resilience

Submitted by bschmidt on Sep 18, 2026
  • Read more about Exploring Geothermal Potential in Rico, Colorado: Supporting Rural Decarbonization & Cultivating Small-Town Resilience
Date
Sep 18, 2026
Geothermal Community
Geothermal Direct Use
Download PDF
Image
Picture of surface manifestation near Rico
THE OPPORTUNITY

Below Rico’s surface lies significant potential for energy independence. Artesian boreholes drilled decades ago reveal a hot water resource north of town, and recent investigation points to a second hydrothermal anomaly to the south. Geologic features indicate a substantial, untapped geothermal reservoir that could offer Rico energy resilience and greater economic agency.

The Rico Geothermal Coalition (RGC), formed in 2022, is exploring Rico’s geothermal resource, researching feasibility of a district heating system that would use a thermal energy network (TEN) to heat the town’s homes and structures (~215 buildings). If this potential is realized, Rico would be the smallest Colorado town to implement such a system, providing a replicable model of community-led geothermal development.

PROGRESS TO DATE

Phase 1 (2024): Funded by a $100K Colorado Energy Office grant, Teverra — a subsurface geoscience and engineering firm — built a 3D integrated model of Rico’s geothermal system synthesizing geology, temperature measurements, geophysical surveys, geochemical analysis, and historic observation.

Teverra developed two conceptual fluid-flow models, both targeting the natural porosity and fracture networks in two promising rock formations: the Leadville Limestone and the Hermosa Formation.

Phase 1 results confirmed these formations as viable reservoir candidates. This research will help RGC pinpoint a favorable location for a test well, reducing financial and technical risk.

Image
Teverra modeling of Rico site
Caption
Teverra’s modeling of Rico’s geothermal resource

Phase 2 (2025–ongoing): A $200K Colorado Energy Office grant funds the drilling of a monitoring well (80–350m depth) north of town and initial district heating network design. Drift Consulting Solutions will manage test well drilling, and the data collected will refine the model and inform next-phase construction decisions.

Image
Chart showing data for Rico exploration
Caption
Key Numbers
COMMUNITY SUPPORT

A 2025 town-wide survey (30% participation) showed strong interest in geothermal development, contingent on cost and preserving Rico's character:

  • 61% interested in geothermal heating for their home
  • 71% favor geothermal for commercial & municipal buildings
  • 77% support integrating geothermal w/other town excavation work

Nearly 60% of residents rely on propane as their primary heat source; 23% rely on wood. Over 30% report their heating system resiliency is questionable when Rico loses power.

VISION

A successful Phase 2 opens the path to a locally-sourced, community-owned energy asset. The project could eliminate dependence on imported propane, generate revenue through a heat-distribution model, support workforce development via new economic opportunity, and serve as a blueprint for rural geothermal initiatives.

FINANCIALS

Phase 1 was made possible by a $100K grant from Colorado Energy Office, which also provided $200K for Phase 2. Drilling and validating a monitoring well in alpine terrain is a capital-intensive undertaking. Phase 2 requires an additional $170K to complete. We are actively seeking funding for the next implementation phases- A comprehensive TEN system design, production well, district heating utility development and construction.

PARTNERS

Teverra LLC · Colorado Energy Office · Western Colorado University · Drift Consulting Solutions · Town of Rico · Clear Energy Economy for the Region (CLEER) · Bedrock LLC · San Miguel Power Association · EcoAction Partners ·Rico Land Collaborative · National Laboratory of the Rockies · Honest Architecture LLC

Quote
The characteristics of the Rico geothermal system are well aligned with the requirements of a community-scale Thermal Energy Network. TEN systems prioritize moderate temperatures, reliability, and distributed heat extraction — making them particularly suitable for low- to medium-temperature geothermal resources.
Attribution
Daniel Alonso Torres, Principal Geoscientist, Teverra LLC
Rico, Colorado is a historic mountain town of fewer than 300 residents, perched at 8,827 feet in the San Juan Mountains. Incorporated in 1879 as a silver mining hub, even today, Rico lacks natural gas infrastructure. Residents rely almost entirely on propane and wood for heat, and a single power line subject to frequent outages delivers electricity to the town.
Authors
Rico Geothermal Coalition
CLEER (Clean Energy Economy for the Region)

Proven Drilling Technologies Help Unlock the Next Generation of Geothermal Energy

Submitted by bschmidt on Sep 17, 2026
  • Read more about Proven Drilling Technologies Help Unlock the Next Generation of Geothermal Energy
Date
Sep 23, 2026
Geothermal Rising
Geothermal Community
Download PDF
Image
NOV Member Focus graphic
Proven drilling technologies help unlock the next generation of geothermal energy

Enhanced geothermal systems (EGS) are rapidly emerging as one of the most promising sources of reliable, carbon-free baseload power. Unlike solar and wind, EGS resources can generate electricity continuously, providing a dependable complement to intermittent renewable energy sources.

And unlike conventional hydrothermal projects that rely on naturally occurring heat, fluids, and permeability, EGS projects create engineered reservoirs in hot, low-permeability rock. Wells are drilled into deep formations, where stimulation techniques establish pathways for circulating fluid that transport heat back to the surface for electricity generation. Because EGS is not limited to naturally productive geothermal reservoirs, it significantly expands where geothermal energy can be developed.

But this promise comes with new challenges, thanks to the demands EGS plays place on drilling and completion tools. Most EGS projects target hard, abrasive formations several kilometers below the surface, where temperatures routinely exceed 200°C (400°F) and can approach or surpass 300°C (572°F). These environments can accelerate equipment wear and increase mechanical loading on bits, bottomhole assemblies, and surface equipment.

To address these challenges, the geothermal industry is drawing on technologies and expertise developed over decades in oil and gas. NOV is adapting proven drilling systems, digital technologies, and well construction solutions to meet the demands of deeper, hotter geothermal environments and improve drilling performance while reducing risk and cost.

This approach was central to Fervo Energy’s recent appraisal campaign at Project Blanford in Millard County, Utah. Working alongside Fervo, NOV supplied a suite of drilling technologies that helped execute one of the industry’s most technically demanding geothermal drilling programs to date. The following sections review these technologies and how they supported Fervo’s delivery of the hottest geothermal well in the company's history.

Quote
Project Blanford was the perfect proving grounds for adapting proven drilling technologies to help improve efficiency, reduce operational risks, and accelerate the commercialization of enhanced geothermal systems.
Attribution
Chuck Wright, NOV Corporate R&D Manager
Maintaining visibility in extreme drilling environments

At Project Blanford, having continuous access to downhole conditions was essential as the drilling operation progressed into deeper, hotter, and more challenging formation conditions.

NOV’s RigSense™ 4.0 electronic data recorder (EDR) served as the central platform for collecting and visualizing drilling data, continuously capturing key operational parameters including weight on bit, torque, rotary speed, rate of penetration, standpipe pressure, pump rates, and flow volumes.

Together, these measurements provided drilling personnel with a comprehensive picture of mechanical loading and hydraulic performance, allowing teams to identify changing formation responses, optimize drilling parameters, and manage equipment stress as conditions evolved.

The system also created a common operating picture across the rig while supporting collaboration between field and office-based personnel. Integrated with NOV's WellData™ 4.0 information system, drilling data was transmitted in real time to engineering and operations teams located away from the wellsite, enabling technical specialists to evaluate drilling performance using the same information available to rig crews.

Image
The WellData 4.0 information system
Caption
The WellData 4.0 information system gives remotely located technical specialists the same real-time access to drilling data as the rig crew, enabling more effective collaboration and improved decision-making.

This shared visibility allowed for faster decision-making as drilling conditions changed. This capability becomes increasingly valuable as geothermal wells push into deeper, hotter reservoirs.

Managing fluids for reliable drilling performance

Fluid management was equally important throughout the drilling campaign. Beyond transporting cuttings to the surface, drilling fluids were also essential to maintaining wellbore stability, supporting hydraulic efficiency, and assisting in cooling drilling components in the bottomhole assembly.

NOV’s pit volume totalizer (PVT) system continuously monitored pit volumes, inflow and outflow rates, and overall fluid behavior during drilling. The system provided real-time visibility into fluid gains and losses, as well as additional insight into changing downhole conditions.

Maintaining continuous awareness of drilling hydraulics and fluid performance provided another layer of operational confidence as the appraisal well advanced toward its target depth. 

Engineering drilling technologies for hard, high-temperature rock

While digital systems improved operational awareness, drilling performance ultimately relied on equipment capable of withstanding the demanding geothermal environment.

Before drilling began, NOV worked with Fervo's drilling team to evaluate anticipated formation characteristics and operational objectives for the well. Based on those discussions, NOV supplied drill bits equipped with its ION+™ Fortis™ polycrystalline diamond compact (PDC) cutter technology for the intermediate and production hole sections.

Image
The ION+ Fortis PDC cutter
Caption
The ION+ Fortis PDC cutter is designed for durability, improved tangential strength, enhanced thermal stability, and reduced flexing and cracking—resulting in higher penetration rates in long-lateral, high-temperature intervals.

Originally designed for durability in the mechanically demanding, interbedded formations encountered in unconventional oil and gas wells, the ION+ Fortis’s hybrid impact- and abrasion-resistant cutter design combines impact resistance with abrasion resistance—an advantage when drilling hard, heterogeneous geothermal formations.

For Project Blanford, the bit design was further optimized with enhanced cutter technologies, modified blade geometries, and hydraulic improvements that increased cutter cooling and debris evacuation. These engineering modifications helped reduce mechanical loading while preserving cutter durability at elevated temperatures.

Extending bit life is particularly valuable in geothermal drilling, where every trip out of the hole adds time, cost, and additional thermal cycling for drilling equipment. Maximizing footage drilled per bit can contribute to improved project economics.

Field performance indicated the effectiveness of the optimized bit. The PDC bits delivered higher penetration rates, longer run lengths and bit life, and consistent drilling performance throughout much of the well. NOV PDC bits drilled a significant portion of total well footage.

Efficient solids control supports drilling efficiency

Hard-rock geothermal drilling also generates large volumes of abrasive cuttings that must be removed continuously to maintain drilling fluid properties, protect downstream equipment, and support consistent hydraulic performance.

NOV Alpha™ shakers served as the primary solids-control stage at Project Blanford. Their 7G+ linear-motion design and optimized fluid handling capability helped enable efficient processing of high drilling fluid volumes to maximize cuttings dryness and preserve valuable drilling fluid.

Image
The Alpha shaker
Caption
The Alpha shaker is designed for optimally enhanced linear motion to process more fluid at higher rates, deliver drier cuttings, and reduce operational drilling costs.

Alpha’s design also incorporated an optimized vibration system that enabled the shaker to operate significantly quieter than conventional systems, contributing to a more comfortable work environment for rig personnel while maintaining solids-processing performance.

Demonstrating what's possible for next-generation geothermal

Together, NOV’s real-time drilling intelligence, optimized drilling tools, and solids-control systems provided an integrated solution for maintaining drilling performance in one of the industry’s most demanding environments.

Fervo drilled the vertical appraisal well to approximately 3.4 km (11,200 ft), where measured temperatures exceeded 290°C (555°F)—well above the threshold required for commercial geothermal development. According to the company, the well was drilled in fewer than 11 days and established the hottest geothermal well in Fervo's history while confirming an ultra-high-temperature resource capable of supporting a potential multi-gigawatt development.

As enhanced geothermal systems continue moving from demonstration projects toward commercial deployment, the combination of proven drilling expertise and purpose-built innovation will become increasingly important. Project Blanford provides a compelling example of how transferring knowledge and technology across energy sectors can help unlock deeper, hotter geothermal resources and accelerate the delivery of reliable, carbon-free power at scale.

Quote
For NOV, Project Blanford reflects our strategy of applying decades of well construction experience to geothermal applications. Rather than developing new drilling systems from the ground up, we’re focused on adapting proven technologies for the unique thermal and mechanical demands of geothermal wells.
Attribution
Alexis Garcia, Director, NOV Geothermal

Member Focus articles are a paid member benefit and are provided by the featured Geothermal Rising member. They do not necessarily represent the views or positions of Geothermal Rising. Publication does not constitute an endorsement of the featured company, its products, services, or opinions.

Member Focus: NOV supported Fervo Energy's Project Blanford appraisal campaign in Utah with an integrated suite of drilling technologies, drawing on decades of oil and gas experience. Real-time drilling intelligence, fluid monitoring, optimized PDC cutter technology, and solids-control systems helped maintain drilling performance as the vertical appraisal well reached approximately 3.4km and temperatures exceeding 290°C. According to Fervo, the company drilled the well in fewer than 11 days, making it the hottest geothermal well in its history. This article explores how proven drilling technologies can be adapted to meet the thermal and mechanical demands of enhanced geothermal systems and help accelerate commercial-scale deployment.

Breaking the Depth Barrier with Millimeter-Wave Drilling and the First Superhot Geothermal Power Plant

Submitted by bschmidt on Aug 18, 2026
  • Read more about Breaking the Depth Barrier with Millimeter-Wave Drilling and the First Superhot Geothermal Power Plant
Date
Aug 19, 2026
Geothermal Community
Geothermal Rising
Download PDF
Image
Member focus graphic (Quaise)
The ceiling that kept geothermal small

Conventional geothermal development typically reaches depths of about two kilometers and temperatures around 200°C. At those conditions, wells produce useful heat and power, but output per well remains modest relative to the thermal resource below. Enhanced geothermal systems have begun pushing into hotter, tighter formations, yet the fundamental constraint remains: rotating drill bits, motors, and downhole electronics degrade rapidly as temperatures climb past 200–250°C.

The result is an industry that contributes less than one percent of global electricity despite sitting atop a resource that dwarfs demand. The U.S. Department of Energy has set a target to increase geothermal power production twenty-fold by 2035 through EGS. Even that ambitious goal only begins to close the gap between what is technically accessible today and what exists at depth.

The deeper and hotter you go, the physics improve: higher enthalpy fluids, greater density contrasts between injection and production, and more efficient power conversion at the surface. What has been missing is a drilling system that can survive and perform economically under those conditions.

Image
Quaise Energy's energy potential comparison
Caption
Quaise Energy's energy potential comparison showing superhot geothermal wells produce 10x the energy of conventional systems, fundamentally changing project economics and land use.
From fusion science to field-tested drilling

Millimeter-wave drilling originated in decades of gyrotron research at MIT, where high-power microwave sources were developed for plasma heating in fusion reactors. Quaise adapted that science into a drilling system: a surface-based gyrotron generates concentrated millimeter-wave energy, which is transmitted down a waveguide to the rock face with minimal energy loss.

At the bottom of the hole, the directed energy ablates rock through thermal spallation and vaporization rather than mechanical grinding. No rotating bit contacts the formation. Because the energy source sits at the surface, it is not exposed to downhole temperatures or pressures. Cuttings are removed by a pressurized purge gas system rather than heavy drilling mud, eliminating many of the circulation challenges that plague deep conventional wells.

The system has already penetrated more than 100 meters through granite in field conditions, proving the approach works in the crystalline basement lithologies where superhot rock is found. That milestone moved the technology from laboratory demonstration to field validation.

Depth isn’t an advantage; the superhot resource is.

Project Obsidian, first commercial superhot EGS

Project Obsidian, located in Central Oregon, will be the first commercial deployment of millimeter-wave drilling and the world's first superhot geothermal power plant designed from the outset to operate at 300–500°C.

The development follows a phased approach:

Phase I delivers 50 MW through a combination of conventional drilling for upper well sections and millimeter-wave drilling to reach superhot depths. Phase II expands the facility to 250 MW by accessing deeper, hotter rock below the initial wells, reaching temperatures up to approximately 450°C. Phase III targets 1+ GW as the site and technology mature.

The site was chosen as the best-studied, most economically viable location in the United States to prove superhot geothermal at scale. Quaise has secured land leases and commercial offtake agreements, with first power targeted by 2030.

Surface facilities will use high-efficiency turbines operating at the highest available capacity factors for geothermal, delivering firm baseload power with zero fuel, zero waste, and zero emissions. The compact footprint means less land disturbance per megawatt than any other thermal generation technology.

Image
Rendering of the Project Obsidian facility in Central Oregon
Caption
Rendering of the Project Obsidian facility in Central Oregon, surrounded by native forest showing the compact surface footprint of a superhot geothermal power plant to deliver 50 MW in Phase I with zero fuel, waste, and emissions, scaling to 250 MW and 1+ GW in subsequent phases.
Why superhot production changes the economics

At 300–500°C, water enters a supercritical or near-supercritical state with properties that transform well productivity. The working fluid exhibits gas-like viscosities (enabling easy flow through engineered fracture networks), liquid-like densities (maximizing heat transport per unit volume), and extreme density contrasts between injection and production wells (minimizing parasitic pumping loads).

The combined effect is 5–10 times as much electricity per well as conventional geothermal, and potentially up to 100 times as much as low-temperature systems. Higher temperatures also mean higher Carnot efficiency in the turbine, so a greater fraction of the extracted heat is converted to electricity.

Crucially, the geochemistry in a superhot engineered reservoir is controlled rather than inherited. Water chemistry is managed to prevent scaling and corrosion, sustaining decades of peak heat transfer. Working in deeper, tighter formations also reduces water losses compared to shallower fractured systems.

Quote
Thermodynamics reward you exponentially when you move from 200°C to 400°C. You are not getting twice the power; a single superhot well replaces five to ten conventional wells. That changes everything about project economics, land use, and speed to capacity.
Looking Ahead

Project Obsidian is designed as a proof point, not an endpoint. Quaise's tiered development roadmap starts in areas with the highest geothermal gradients (Tier I sites such as Central Oregon), then scales to Tier II and Tier III locations where superhot rock occurs at greater depths. Millimeter-wave drilling's independence from downhole temperature makes those deeper targets accessible without an exponential cost escalation.

The long-term implication is geographic: superhot geothermal could expand east of the Cascadia volcanic arc, east of the Mississippi, and beyond the global Ring of Fire, potentially bringing firm clean power within reach of more than 90 percent of the world's population. That is a fundamentally different value proposition than conventional geothermal's dependence on rare volcanic hotspots.

Quaise is also investing in regional partnerships, including collaboration with Oregon State University's Experimental Deep Geothermal Energy (EDGE) lab, to characterize subsurface conditions common to superhot systems and build a knowledge base that benefits the broader industry.

Takeaway for the Geothermal Community

The transition from mechanical to directed-energy drilling represents more than an incremental improvement. It removes the temperature ceiling that has defined geothermal's scale for decades. Project Obsidian will test whether that removal translates into the economic and operational advantages predicted by the physics.

Three implications for the wider community:

  1. Superhot conditions improve every variable that matters: power per well, conversion efficiency, land intensity, and long-run cost. If the physics hold at commercial scale, geothermal competes directly with fossil baseload on economics, not just emissions.
  2. Drilling technology is the bottleneck, not the resource. The thermal energy below three kilometers is effectively unlimited. Systems that can reach it affordably redefine geothermal from a geography-constrained niche to a universal energy source.
  3. First-mover projects like Obsidian will generate operational data that the entire industry needs. Performance data from superhot wells, millimeter-wave penetration rates, and long-term reservoir behavior at supercritical conditions will inform EGS design worldwide.

If Project Obsidian delivers on its phased targets, the geothermal industry's conversation shifts from how to expand incrementally to how fast it can scale.

Member Focus: Geothermal power has always been limited by how deep and how hot conventional tools can go. For decades, the industry has operated within a temperature ceiling set by mechanical drill bits, restricting commercial development to moderate-depth hydrothermal reservoirs and leaving more than 99 percent of Earth's thermal energy untapped. Quaise Energy's millimeter-wave drilling system, developed from over a decade of fusion science research at MIT, removes the mechanical constraint entirely by using high-frequency electromagnetic energy to ablate rock without contact. Project Obsidian in Central Oregon will be the technology's first commercial deployment, targeting superhot conditions of 300–500°C where each well can deliver 5–10 times the electricity of conventional geothermal systems. This article examines how the transition from mechanical to directed-energy drilling could redefine the scale, geography, and economics of geothermal power.

Advancing with the Heat in Geothermal Drilling Fluids

Submitted by bschmidt on Jul 23, 2026
  • Read more about Advancing with the Heat in Geothermal Drilling Fluids
Date
Jul 23, 2026
Geothermal Rising
Geothermal Community
Download PDF
Image
GR/Sinclair blog graphic
From early hydrothermal to today’s frontier wells

When commercial geothermal projects accelerated in the late 1970s and 1980s, most development focused on high-permeability hydrothermal reservoirs. Wells were hot and sometimes sour, but depths were moderate, and bottom-hole temperatures, while challenging, sat within the performance envelope of many oil and gas drilling fluids.

Sinclair entered the market during this period with a specific focus on geothermal drilling fluids. Unlike generalist service companies that shifted in and out of geothermal as commodity cycles changed, Sinclair built its business almost entirely around high-temperature, high-enthalpy projects. Over time, that narrow focus became an advantage. The company accumulated a library of mud reports, treatment records, and loss-control case histories across dozens of fields.

As developers drilled deeper and chased hotter rock, early fluid systems began to show their limits:

  • Standard polymers lost viscosity at elevated temperatures.
  • Conventional lost-circulation materials struggled in wide, thermally stressed fractures.
  • Wellbore stability became harder to maintain in crystalline rock and highly fractured formations.

These challenges pushed geothermal fluids away from simple adaptations of oil and gas systems toward purpose-built formulations for high-temperature and extreme-loss environments.

Building fluids for higher temperatures and fractured rock

The first major shift came with the adoption of synthetic, high-temperature polymer systems designed to retain rheology after prolonged exposure to elevated bottom-hole temperatures and repeated circulation cycles.

Image
Geothermal mud engineers monitor rheology and losses
Caption
Geothermal mud engineers monitor rheology and losses in real time, tuning high-temperature drilling fluids to evolving downhole conditions.

Sinclair and other geothermal specialists began to:

  • Qualify polymers in autoclave tests that approximate downhole conditions rather than relying solely on surface-temperature properties.
  • Combine temperature-stable polymers with carefully chosen weighting agents to maintain density without compromising rheology or filtration.
  • Use brine-based or mixed-salt systems aligned with reservoir chemistry to reduce scaling and minimize damage.

At the same time, lost circulation was becoming a defining issue, especially as wells entered naturally fractured formations and the crystalline basement. Severe losses could consume large volumes of fluid, add cost, and increase nonproductive time.

The response included:

  • Engineered blends of granular, fibrous, and flake materials tailored to specific fracture apertures.
  • Staged lost-circulation “ladders,” where pills were designed with increasing particle size ranges to bridge a wider spectrum of loss pathways.
  • Close coordination between fluid design and cementing plans to ensure that remedial squeezes and isolation jobs would remain compatible with the drilling fluid system.

In many fields, these approaches enabled operators to drill intervals that had previously required repeated sidetracks or lengthy cure periods.

Lessons from FORGE in Milford, Utah

The U.S. Department of Energy’s Frontier Observatory for Research in Geothermal Energy (FORGE) site in Milford, Utah, marked a significant turning point in geothermal drilling practice. Instead of targeting a naturally productive hydrothermal reservoir, FORGE focused on creating and characterizing an engineered reservoir in hot, low-permeability crystalline rock.

Sinclair served as the dedicated provider of geothermal drilling fluids for the FORGE wells. The project demanded a combination of temperature performance, low formation damage, and robust loss-control capability in granite and other crystalline lithologies.

Image
Drilling at the FORGE site in Milford, Utah
Caption
Drilling at the FORGE site in Milford, Utah, where high-temperature fluid systems and planned lost-circulation strategies were tested in crystalline basement rock.

Several key lessons emerged.

Temperature margin as a design requirement

Bottom-hole temperatures and circulating times at FORGE pushed fluid formulations close to their limits. Lab screening focused on polymers and fluid-loss additives that could withstand exposure to elevated temperatures for extended periods without severe thinning or breakdown. Operationally, this allowed crews to maintain hole cleaning during long static periods for data acquisition or stimulation work. 

Lost circulation as a design condition

In crystalline basement, natural fractures are common and often intersect at high-pressure differentials. Rather than treating every loss as an unforeseen challenge, the FORGE program incorporated pre-planned loss-control strategies. Sinclair deployed staged treatments and customized blends based on field diagnostics, helping to maintain sufficient hydrostatic head while limiting total fluid losses.

Quote
In EGS and superhot rock, lost circulation is not an accident; it is a design condition that has to be planned for from the very first well.
Attribution
Christian Heriard – Senior Drilling Fluids Engineer

Data continuity and iterative improvement

Because the same fluids team supported multiple wells and phases, treatment records, return volumes, and condition monitoring from early operations could feed directly into later wells. That continuity shortened learning cycles and improved confidence in how the systems would behave as the project advanced.

The systems and practices proven at FORGE are now informing drilling-fluid design for a growing set of commercial EGS ventures and technology spin-outs that trace their origins to the Milford program.

Extending experience to EGS and superhot rock

As EGS and SHR concepts move from pilot projects toward larger developments, drilling fluids face an even steeper set of requirements. Wells may target hotter rock, tighter formations, or both. Some SHR designs anticipate conditions where circulating fluids will be exposed to supercritical or near-supercritical environments.

Drawing on FORGE and earlier international work, Sinclair has focused on three broad themes for these next-generation wells.

Temperature survival beyond conventional limits 

Fluid systems are screened for both short- and long-term thermal stability, including heating and cooling cycles as operations move between drilling, conditioning, and stimulation. High-temperature polymers, stabilizers, and carefully chosen base fluids are combined to maintain rheology while minimizing degradation products that could plug fractures or damage tools. 

Wellbore integrity in engineered reservoirs

EGS and SHR wells rely heavily on long-term integrity of the wellbore and the near-wellbore region. Drilling-fluid design is coordinated with cement systems and with anticipated stimulation treatments. The goal is to maintain borehole support while limiting chemical interactions that might weaken cement or alter fracture geometry in unintended ways.

Quote
Geothermal drilling does not stand still. The rock keeps getting hotter, and the wells keep getting more complex. The only way to stay ahead is to treat fluids as an evolving technology, not a fixed recipe.
Attribution
Ron Tate – Vice President, Geothermal & Oil and Gas

Lost-circulation strategies for extreme conditions

Severe, total, and cyclic losses are expected rather than exceptional in many EGS and SHR settings. Engineered lost-circulation designs for crystalline rock are being adapted to anticipated fracture networks in new project areas, including regions under evaluation in Oregon and other western U.S. states. Emphasis is placed on materials that remain stable at high temperatures and do not compromise future stimulation or production.

Across these themes, much of the value lies not in any single product but in the accumulation of field experience and lab data that allows fluid systems to be tuned for each new prospect.

Why long-term specialization matters

Service participation in geothermal has often mirrored commodity cycles in oil and gas. When oil prices are high, many providers are fully occupied; when prices fall, geothermal suddenly looks attractive again. The result can be an intermittent presence, making it hard to sustain specialized expertise.

Sinclair’s business model has been different. With geothermal drilling fluids as a central focus since the 1970s, the company has remained active through multiple market cycles. That continuity has practical consequences:

  • Historical mud data and performance records are available when operators return to a field after many years.
  • Lessons learned in one campaign can be carried forward to subsequent wells rather than being relearned from scratch.
  • Research investments in polymers, loss-control blends, and high-temperature testing feed directly into live projects instead of being shelved between cycles.

For developers planning multi-well EGS or SHR campaigns, long-term technical partners in drilling fluids and other critical services can be as important as the rig or the drilling program itself.

Takeaway for the Geothermal Community

The story of geothermal drilling fluids over the past four decades is a story of steady adaptation to higher temperatures, more fractured formations, and engineered reservoirs. 

Sinclair’s work from early hydrothermal projects through FORGE and into emerging EGS and SHR efforts illustrates several principles the wider community can apply:

  • Design fluids for the end state, not just the first well. Anticipate how temperature, chemistry, and losses will evolve across a campaign.
  • Treat high temperatures and severe losses as design conditions. Build strategies and testing protocols around them, rather than reacting only when problems arise.
  • Value continuity of expertise. Long-term specialty providers can shorten learning curves and reduce both technical and financial risk for ambitious new projects.

As geothermal developers aim for scalable EGS and superhot rock assets, drilling-fluid innovation will remain one of the quiet but essential enablers. The wells that unlock the next generation of geothermal resources will depend as much on what circulates inside the hole as on the rock they reach.

Member Focus: Geothermal wells have marched steadily into hotter, deeper, and more complex geologies. Along the way, drilling fluids have evolved and advanced, from conventional hydrothermal recipes into systems capable of withstanding the conditions of enhanced geothermal systems (EGS) and superhot rock (SHR). This article traces the technical progression of geothermal drilling fluids over four decades of fieldwork by Sinclair, from early hydrothermal projects to FORGE and emerging EGS and SHR campaigns, highlighting lessons in temperature tolerance, lost-circulation control, and wellbore stability that can help shape the next generation of geothermal wells.

Geothermal Discovery Day: Engaging the Next Generation at GRC

Submitted by bschmidt on Jul 09, 2026
  • Read more about Geothermal Discovery Day: Engaging the Next Generation at GRC
Date
Jul 09, 2026
Geothermal Community
Geothermal Rising
Image
Group photo taken at Geothermal Discovery Day, 2025

The future of the geothermal industry relies on raising community awareness and reaching the next generation of thinkers and doers. At the 2025 Geothermal Rising Conference (GRC) in Reno, Nevada, the workforce success committee successfully opened its doors, at no cost, to the public for "Geothermal Discovery Day," a gathering full of scientific exploration. We were ecstatic to welcome the 127 local community members and GRC affiliated folks who attended this wonderful event, many of whom were children who joined us without any previous education on geothermal.

The event kicked off at The Discovery Museum, offering a pizza party, during which the attendees received a quick, simple introduction to geothermal and why it matters. Families had free copies of “The Happy House” and coloring pages at their tables, and we were able to see the organic enthusiasm growing as they began to see the value of using the earth to save the earth. Including art and play in STEM learning makes it more accessible for youngsters, and this was a main theme for the day.

Image
Amelia Letvin welcomes attendees to Geothermal Discovery Day
Caption
Amelia Letvin welcomes attendees to Geothermal Discovery Day

Following the pizza party, we hosted live science demonstrations, including one called “Drilling for Geothermal Cake,” led by Rochelle Longval which utilized a sheet cake that had been divided into a grid with frosting. The young attendees used clues to determine where to drill into the cake to find geothermal (symbolized by red velvet), which demonstrated the step-by-step process that goes into a geothermal project from conception to completion. After plenty of fun and some delicious cake, the kiddos were given full access to the museum's exhibits.

Image
Rochelle Longval presents “Drilling for Geothermal Cake”
Caption
Rochelle Longval presents “Drilling for Geothermal Cake”

Once we’d all had our fill of the museum’s many activities and exhibits, families migrated to the Downtown Reno Public Library for interactive reading and art sessions. Activities included a face painter, coloring stations, and a reading of the children's books The Happy House by Egg Geo, and Our Hidden Powers by Kristina Hagstrom Illievska and Gabriella Skog of Baseload Capital. The library also hosted a geothermal-themed scavenger hunt featuring characters from Our Hidden Powers alongside characters from Egg Geo's own children’s book, The Happy House. We were glad to provide these activity books to support the day's educational goals.

A great deal of work, planning, and passion went into Geothermal Discovery Day, but I can confidently say that it was done with joy and excitement from start to finish. There is a shift in focus within this industry; it’s no longer a concentrated push for educating the policy makers and adjacent industries, but also includes community members and the rising generations.

Image
Mimi Egg, Rochelle Longval, and Jay Egg

The 2025 Geothermal Rising Conference was a success in countless ways, but as a company focused on education, we were thrilled to be included in the Discovery Day event. We firmly believe that leading by example by making community activities and resources accessible, and we take practical steps toward demystifying geothermal technologies for our neighbors and communities.

Image
Egg Geo 2024

This blog post was brought to you by the GR Workforce Success Group, as part of an initiative to highlight community outreach success stories in the geothermal community. We are committed to fostering a collaborative community to create a brighter future for Earth and all its inhabitants. If you are interested in supporting Workforce Success, want to get involved, or have an idea for another blog post - reach out to Amelia Letvin at, amelia@geothermal.org 

Read more on the Workforce Success webpage: https://geothermal.org/our-impact/workforce-success 

For more information about attending this year's Geothermal Discovery Day, please see: https://geothermal.org/events/2026-geothermal-discovery-day

This inaugural event was held on October 26th, 2025. Join us on Sunday, September, 20, 2026 at the Children's Museum Houston for this year's event!
Authors
Mimi Egg

High-Power Turbines for the Next Wave of Binary Geothermal

Submitted by bschmidt on Jun 17, 2026
  • Read more about High-Power Turbines for the Next Wave of Binary Geothermal
Date
Jun 17, 2026
Geothermal Rising
Geothermal Community
Download PDF
Image
Exergy GR Member Graphic
Bigger binary plants, bigger flow problems

Binary plants based on the Organic Rankine Cycle use a closed organic working fluid to extract heat from geothermal brine and then reject that heat through air-cooled or water-cooled condensers. As unit sizes increase, designers raise the mass flow of the working fluid to move more heat through the cycle.

At the turbine, that choice appears as a volumetric-flow problem. Large plants can push flow at outlet conditions to levels that require a single radial outflow machine to have very wide passages, large casings, and long blades. When dimensions grow this way, efficiency and mechanical robustness become harder to maintain.

Many plants solve the problem by splitting the flow into two parallel turbines. That approach works, but each additional machine adds foundations, piping, valves, auxiliaries, and maintenance tasks. For large developments built from repeated modules, the extra complexity compounds.

Quote
High-flow is not only a thermodynamic challenge; it is also a mechanical one that affects turbine size, layout, and plant cost.
Attribution
Giorgia Ruffato, Turbine Engineer, Exergy International
Dual-flow radial outflow design

Exergy’s Gemini turbine concept retains the radial-outflow architecture but divides the flow path within a single body rather than using multiple separate machines.

The working fluid enters from two symmetric inlets. Each side feeds a mirrored set of stages mounted on a common rotor disk. The flow expands radially outward on both sides, then turns and exits toward a central exhaust. The rotor sits between bearings rather than in an overhung configuration, which improves stiffness and rotor dynamics for a machine of this size.

This layout roughly doubles the volumetric-flow capacity of a single turbine frame while targeting turbine isentropic efficiency above 90 percent. Instead of two smaller turbines, a plant can run one dual-flow machine on a single shaft, keeping the rest of the power island comparatively simple.

Image
3D image of Gemini turbine
Caption
3D section of the Gemini Turbine
Reference design for a 50 megawatt module

Exergy’s technical paper for the Geothermal Rising Conference uses a 50 megawatt binary plant as a reference case. The study represents a medium-enthalpy enhanced geothermal system with high brine flow and air cooling.

Brine enters the heat-exchange train at around 200 degrees Celsius and leaves at around 96 degrees before reinjection. Flow is on the order of 2,000 metric tons per hour. The working fluid is commercial n-butane, preheated and vaporized in shell-and-tube exchangers and slightly superheated before entering the turbine.

In this model, the Gemini turbine expands the working fluid through six stages and delivers slightly above 50 megawatts of mechanical power at the shaft. Gross electrical output at the generator sits around 50 megawatts, with net output just over 40 megawatts after auxiliary loads. Cycle efficiencies fall in the expected high-teens to low-twenties range for this temperature window.

An induced-draft air-cooled condenser closes the loop, allowing operation in areas where cooling water is constrained and keeping the geothermal fluid in a closed circuit from production to reinjection. The study team performed one-dimensional sizing, computational fluid dynamics simulations of the flow paths, and structural and rotor-dynamic checks. CFD results matched preliminary design values within a few percent. Stress and vibration analyses showed comfortable margins against yield and resonance for the modeled operating envelope.

Image
3D image of Gemini turbine
Caption
3D model of the Gemini Turbine
Binary technology in the field

Exergy’s current geothermal fleet already includes large binary units operating across different environments. The Gemini concept extends that family into higher-flow ranges, but the company’s installed base illustrates how binary technology is being used today.

Image
United Downs in the United Kingdom
Caption
Radial Outflow Turbine onsite construction at United Downs in Cornwall
uses a binary plant to generate electricity and support lithium-extraction
operations from deep geothermal fluids.

At United Downs in the United Kingdom, a binary unit provides power from a deep well in Cornwall while also supporting a lithium extraction process using the produced fluids. The facility sits close to residential and industrial areas, so the surface plant must remain compact and quiet while delivering firm power from a new resource.

Image
Mahanagdong power plant
Caption
At Mahanagdong in the Philippines, a 24 megawatt binary unit adds
generation from lower-temperature brine at an existing geothermal field.

In the Philippines, a 24 megawatt binary unit at Mahanagdong uses lower-temperature brine from an established field to add generation without new high-enthalpy production. The plant operates in steep, forested terrain with heavy rainfall, which makes a compact, integrated power island valuable. Both projects use Exergy’s existing radial outflow turbines rather than the
new dual-flow design, yet they highlight a common theme. Binary systems are increasingly installed as flexible building blocks that work alongside existing fields, industrial processes, and new mineral-recovery schemes.

Implications for enhanced and advanced geothermal

Enhanced and advanced geothermal systems often target medium-enthalpy resources with high volumetric flow. Wells can be directionally drilled, stimulated, or configured as closed loops to create heat-exchange areas in rock that would not flow naturally. Surface systems must convert that steady flow into reliable power at competitive cost.

Binary plants already form the backbone of many of these concepts. The main question is how individual units can scale up without adding unnecessary complexity. High-flow radial outflow turbines provide one answer. A single dual-flow machine that can handle the working-fluid volume of a 50 to 60 megawatt module allows designers to:

  • Keep turbine layouts simple while increasing unit size.
  • Reduce the number of foundations, valves, and auxiliaries per module.
  • Maintain strong efficiency in a flow regime that would otherwise require multiple machines.

For developers and operators, turbine design becomes a front-end choice along with well architecture and brine chemistry. Matching turbine configuration to flow and temperature is part of de-risking large projects before the first well is drilled.

Quote
Advances that streamline plant design and raise module output offer developers real value: more power, easier project scaling, and improved economics.
Attribution
Luca Pozzoni, Deputy CEO and Group CFO
Takeaway for the developers and operators

Large binary geothermal units demand turbine designs that can manage very high volumetric flows while staying efficient and mechanically robust. Dual-flow radial outflow machines, such as Exergy’s Gemini concept, show that it is possible to increase unit size without multiplying the number of turbines.

As enhanced and advanced geothermal projects grow, success will depend on both the engineered reservoir underground and the power-conversion hardware at the surface. High-flow turbines are becoming a key part of that surface toolkit, turning more of the available heat into dependable megawatts while maintaining practical layouts for construction and operation.

Member Focus: Binary geothermal plants are scaling into the 30 to 60 megawatt range. Higher output means much higher working-fluid flow through the turbine, which can push conventional machines beyond their comfort zone. Exergy International’s Gemini concept shows one way turbine design is evolving to handle these flows in a single unit, simplify plant layouts, and support future Enhanced Geothermal Systems (EGS) and Advanced Geothermal Systems (AGS).

Solving Energy Poverty Through Geothermal Renaissance

Submitted by bschmidt on May 19, 2026
  • Read more about Solving Energy Poverty Through Geothermal Renaissance
Date
May 20, 2026
Geothermal Community
Geothermal Rising
Download PDF
Image
EggGeo Member Article Graphic
Energy poverty is still the real challenge

Energy poverty is often described as a problem somewhere else, in poorer countries or in remote communities far from modern infrastructure. In practice, it is much closer and much more common. It appears that anywhere households struggle to afford heating and cooling, public buildings face rising energy bills, and where energy insecurity narrows the choices available to families, schools, clinics, and local businesses.

That human reality matters because access to reliable energy affects more than comfort. It shapes health, educational attainment, workforce participation, and economic stability. When heating and cooling become unaffordable or unpredictable, communities absorb the cost in multiple ways.

Geothermal has a distinctive role in that conversation. Unlike intermittent resources, it can provide stable heat and power around the clock. Egg Geo’s perspective is that this reliability should be understood not only as an engineering achievement, but as a public benefit with direct implications for affordability and resilience.

Image
People protesting energy poverty
Caption
Energy poverty is not abstract. For many households, it shapes daily choices about warmth, food, health, and stability.

Framing geothermal this way expands the conversation. The value of geothermal is not limited to megawatts, gradients, or drilling performance. It also lies in its ability to stabilize access to an essential service. Clean, dependable thermal energy supports dignity, health, and continuity in ways that are easy to overlook when the industry focuses only on generation.

Quote
Reliable thermal energy is part of what makes health, dignity, and economic mobility possible.
Attribution
Jay Egg, President of Egg Geo
Thermal energy networks move the conversation closer to deployment

One of the most practical ways to translate that idea into the built environment is through thermal energy networks. These systems move thermal energy across buildings and districts, sharing heating and cooling loads in ways that can improve system efficiency and reduce long-term cost.

That matters because heating and cooling still receive less public attention than electricity, even though they represent a major share of energy demand. District-scale geothermal and networked thermal systems offer a way to address this gap directly by serving schools, housing, healthcare facilities, campuses, and commercial buildings with more stable and efficient heating and cooling.

Image
Thermal imaging of buildings
Caption
The geothermal renaissance will be measured by what we can actually build, train for, and deliver at scale.

The opportunity is larger than any one technology. In the United States, district geothermal heating remains comparatively limited, while other countries have built much larger thermal systems and achieved far greater average capacity per project. That gap suggests room for growth, especially if the sector can pair proven heat-pump and hydronic approaches with improved design tools, stronger deployment models, and more coordinated policy support.

Egg Geo points to several areas where innovation can help close that gap, including fifth-generation ambient loops, agentic AI design tools, and engineered geothermal systems. The underlying point is not novelty for novelty’s sake. It is that geothermal and thermal infrastructure needs to become easier to design, replicate, and integrate into real communities.

Technology does not scale without people

New infrastructure does not materialize because an idea is technically sound. It gets built because trained people know how to design it, install it, commission it, operate it, and maintain it over time.

That makes workforce development central to the geothermal story. If thermal energy networks and next-generation geothermal systems are to expand meaningfully, the sector needs a larger, more skilled labor base that includes drillers, pipefitters, planners, designers, control specialists, utility personnel, and local contractors.

Innovation in geothermal should not be separated from the physical reality of delivery. Technologies such as engineered geothermal systems, advanced heat-pump configurations, and ambient loops may open new opportunities, but they only matter at scale when people are trained to deploy them reliably.

The broader geothermal community already understands part of this challenge. Enhanced geothermal systems, for example, have benefited from knowledge spillover from oil and gas in drilling, well construction, and subsurface engineering. Thermal energy networks may require a similarly intentional effort to build capability across mechanical, civil, utility, and public-sector stakeholders.

Quote
The geothermal renaissance will be measured by what we can actually build, train for, and deliver at scale.
Attribution
Mimi Egg, Director of Marketing
Community turns momentum into infrastructure

No single firm can solve energy poverty, deploy district-scale thermal systems nationally, or establish geothermal as mainstream infrastructure on its own. Progress depends on connected institutions, shared learning, and a stronger ecosystem.

That is where Geothermal Rising and related convenings matter. Events such as the Geothermal Rising Conference and the Thermal Energy Networks Symposium create opportunities for developers, engineers, utilities, policymakers, workforce leaders, and community stakeholders to compare lessons and form deployable partnerships.

This is consistent with Geothermal Rising’s own broader goals around unifying the industry, strengthening community engagement and research, and building the systems needed for long-term growth. The value of those networks is practical. They help move geothermal from isolated pilots and niche demonstrations into repeatable models that can be financed, permitted, built, and maintained.

The ecosystem viewpoint on energy poverty is too large to be addressed with fragmented approaches. It requires alignment between technology providers, local governments, utilities, community advocates, and the workforce that will deliver the projects.

The geothermal renaissance has a human purpose

The clean-energy transition can sometimes become overly abstract, measured only in capacity targets or technology roadmaps. Geothermal has the chance to tell a fuller story. Its value is not just that it works underground, but that it can improve life above ground.

Reliable thermal energy can reduce exposure to volatile fuel costs, improve the resilience of housing and public buildings, and expand access to dependable heating and cooling in communities that need it most. That makes geothermal part of a larger public-interest story, not just a technical niche.

Linking four ideas that are too often separated: energy poverty, thermal energy networks, geothermal innovation, and workforce development. Treated together, they point to geothermal systems that are not only technically impressive but also socially meaningful.

Takeaway for the Geothermal Community

The geothermal renaissance will be stronger if it is tied to everyday outcomes rather than just technical ambition. Energy poverty, affordability, and resilience provide a clear test for whether the industry is solving problems that matter.

This article makes three practical points for the Geothermal Rising community:

  • Geothermal should be understood as a thermal infrastructure opportunity, not only an electricity story
  • Thermal energy networks can help translate geothermal reliability into community-scale benefits
  • Workforce development and industry collaboration are essential if these systems are going to scale

Geothermal’s long-term relevance will depend on both innovation and public value. The more clearly the industry connects those two, the stronger its future will be.

Member Focus: Reliable thermal energy is one of the least-discussed yet most consequential aspects of the energy transition. Heating and cooling costs can strain households, weaken community resilience, and limit economic mobility even in wealthy regions. This article examines how geothermal energy, thermal energy networks, engineered geothermal systems, and workforce development can work together to reduce energy poverty and expand access to dependable clean energy.

Pagination

  • Page 1
  • Next page ››
Subscribe to Geothermal Community

Stay Connected

Image
New Logo

Contact Menu

  • 530.758.2360
  • info@geothermal.org
  • Twitter
  • Youtube
  • LinkedIn

Footer menu

  • Member Login
  • Our Impact
  • Our Organization
  • Privacy Policy
  • Resources

©2026 Geothermal Rising